NYSE-A:HSLV Last: Loading… Vol: Loading… Change: Loading…

TSX:HSLV Last: Loading… Vol: Loading… Change: Loading…

Arrange Logistics Shipping
a
M

Projects

San Luis

Overview

Bonanza Grade Resource

  • Indicated resource: 356 koz Au @ 24.4 g/t Au, 8.4 Moz Ag @ 579 g/t Ag with growth potential1
  • Ranks among the 10 highest grade projects globally in both gold and silver categories2
  • Property-wide exploration never completed
(Click on image to enlarge)

Location

  • 230 km² property, 100%-owned, with multiple styles and episodes of mineralization, largely open for growth and discovery

Mining District

  • Peru – World’s #3 Silver Producer3
  • Wheaton Precious Metals US$4.3B investment (2026) at Antamina
  • Adjacent to Pierina closure (left opening in regional economy)
(Click on image to enlarge)

Future Targets

(Click on image to enlarge)

Schematic Section

Stacked boiling zones

(Click on image to enlarge)
(Click on image to enlarge)

History

  • Bonanza Grade Resource within Epithermal Vein Field Offering Exceptional Growth Potential
  • Sat largely dormant for the past decade as SSR Mining Inc. shifts focus
  • Highlander Silver acquires the San Luis Project from SSR Mining Inc. in May 2024 for US$5M, an additional US$37.5M in contingent cash consideration and a 4% NSR (2% buy back for US$15M prior to construction)
    • US$1.25M paid in June 2025
    • US$1.25M in June 2026
    • US$5M on the completion of a feasibility study
    • US$10M/yr over 3 years on start of production (US$30M total)

Maps & Photos

(Click on images to enlarge)

Cerro Colorado’s 3.5 x 2.5 km alteration zone. Shallow drilling intersected polymetallic mineralization (e.g., 13.5m of 14% Pb/Zn, 0.3% Cu, and 175 g/t Ag) requiring follow-up while two deeper holes intersected low-grade porphyry. Replacement target potential untested.
Ayelen outcrop.
Detailed image of outcrop illustrating both lattice bladed and cockade quartz textures indicative of overlapping hydrothermal episodes and potential stacked boiling zones.

Notes

  1. See the corresponding technical report entitled “Technical Report for the San Luis Property” with an effective date of January 15, 2025, prepared by independent qualified person, Martin Mount, MSc MCSM FGS CGeol FIMMM Ceng and available on SEDAR+ under the Company’s profile.
  2. S&P Global rankings including the San Luis gold-silver project.
  3. United States Geological Survey (2024).